Installation & setup

Pallet to first lift in the bay.

Tire changers and wheel balancers run within 1 hour of the truck leaving. Lifts take 6–10 hours and a helper. Each category below, step by step, with the tools, the torque figures and the break-in rules that keep the warranty valid. Or book a pro and skip it.

  • Step-by-step guides
  • Tech support included
  • Warranty stays intact
  • Pro install available

Read before you begin

Important: Safety first, every time

  • Read the manufacturer’s manual cover to cover before touching a tool. The manual overrides anything on this page.
  • Never work under a raised lift, platform or vehicle that is not on its mechanical locks or a rated stand. Hydraulics alone are not a safety device.
  • Electrical hookups for lifts and tire machines must be done by a licensed electrician to local code. A wrong-wired 220V circuit voids the warranty and can kill.
  • Wear eye protection, gloves and steel-toe boots, and keep children, pets and bystanders out of the work area.
  • Check every fluid level and torque every fastener the manual lists before the first lift. Transport can loosen what the factory tightened.
  • Step beyond your tools or crew? Stop and call (320) 279-4890. A 10-minute call is cheaper than a mistake.

Pick the equipment

Setup guides by category:

Car liftsScissor & mobile column liftsTire changersWheel balancersMotorcycle & ATV lifts

Two-post and four-post car lifts

Atlas, BendPak, Tuxedo, Triumph and iDEAL two-post, four-post and single-post lifts.

  • Time: 6–10 hrs
  • People: 2–3
  • Skill: Advanced
  1. Verify the floor and the space

    You need at least 4 inches of 3,000 PSI reinforced concrete, cured 28 days or more, with no cracks, seams or expansion joints inside the post footprint. Confirm ceiling height (12 feet for most two-post lifts, 10 feet for low-rise and four-post models), and a 220V circuit within reach of the power unit. Run the site readiness checklist further down this page before you unpack.

    Not sure of the slab thickness? Drill a 1/4" test hole at the post location and measure with a bent wire.

  2. Lay out and mark the post locations

    Unpack, inventory every part against the packing list, and read the layout diagram. Chalk the centerline of the bay, measure the post spacing from the manual (typically 132 to 145 inches inside-to-inside), and square the layout with the 3-4-5 method or by matching diagonals to within 1/8 inch. Mark every anchor hole through the base plates.

  3. Raise the posts and anchor them

    Stand the powerside post first with two helpers or an engine hoist, then the offside. Drill anchor holes with a rotary hammer and the bit size specified (usually 3/4"), blow the dust out, and drive the wedge anchors. Shim under the base plates until each post is plumb in both directions, then torque the anchors to spec, commonly 85 to 150 ft-lb. Never grind the floor to level a post.

    Plumb matters more than level. A post out of plumb by 1/4" over its height loads the arms unevenly.

  4. Route the cables, hydraulics and power unit

    Mount the power unit to the powerside post, connect the hydraulic lines, and route the equalizer cables over the sheaves exactly as the diagram shows; a cable on the wrong side of a sheave will fray in weeks. Install the overhead beam or the floor plate and its safety shutoff. Fill the reservoir with AW32 hydraulic oil (not ATF unless the manual says so) and have your electrician connect the 220V single-phase feed on a dedicated breaker.

  5. Bleed, balance and test load

    Raise the empty lift several times to purge air, adjust the equalizer cables so both carriages lock at the same height, and confirm every safety lock clicks in on the way up. Fit the arm restraints and pads, then test with a light vehicle at 12 inches, 36 inches and full height, checking for drift over 5 minutes at each stop. Re-torque the anchors after the first week of use and every 6 months after.

Tip: Keep the paperwork

Keep the packing list and the torque record with the manual. Warranty claims go faster with them.

Scissor lifts and mobile column lifts

Low-rise, mid-rise and full-rise scissor lifts, parking & storage lifts and portable mobile column sets.

  • Time: 2–4 hrs
  • People: 2
  • Skill: Intermediate
  1. Uncrate and inspect

    Cut the banding, remove the crate panels and the shrink wrap, and compare the platforms or columns, power unit, hoses, lift pads, ramps, pendant or remote and manual against the packing list. Photograph the serial plate. Check the cylinders, hoses and cables for shipping damage before anything else; report it to us within 24 hours if you find any.

  2. Fluids, power and batteries

    Power units ship dry or at a partial fill. Fill the reservoir with AW32 hydraulic oil to the mark and connect the hoses exactly as the diagram shows. Have your electrician connect the 220V or 110V circuit the power unit is rated for. Battery-powered mobile columns: charge every column fully before the first lift.

    Hydraulic fittings are sensitive to dirt. Keep every hose capped until the moment you connect it.

  3. Position, anchor or level

    Full-rise and in-ground-style scissor lifts: anchor to the slab with the anchors supplied and torque them to the values in the manual. Portable low-rise and mid-rise units: set them on a flat, level floor and confirm the casters lock. Mobile columns: place one at each wheel, connect or pair the columns, and confirm every column reports on the control panel before you lift.

  4. First raise and function check

    Raise the empty lift through its full travel several times to purge air. Confirm both sides or all columns rise evenly, the mechanical locks engage at every position on the way up, and the lowering control, emergency stop and lock release work as the manual describes.

  5. Test load and break in

    Set a light vehicle on the manufacturer’s lift points and stop at low, mid and full height, checking for drift over 5 minutes at each stop. Recheck the hydraulic level after the first few cycles, and re-torque the anchors after the first week of use and every 6 months after.

Tip: Log it per unit

Log the first-week re-torque per unit. It is the step shops miss most often, and the one a warranty claim asks about first.

Tire changers

Center-post, tilt-back and leverless tire changers with assist arms and bead blasters.

  • Time: 1 hr
  • People: 1–2
  • Skill: Basic
  1. Uncrate, inspect and inventory

    Remove the crate and wrap, check the machine, assist arm, mount/demount head, bead breaker blade, inflation gauge, accessories and manual against the packing list, and photograph the serial plate. Inspect the turntable, clamps, tower and air lines for any transport damage.

  2. Air supply, power and anchoring

    Set the machine on level concrete and anchor it with the bolts the manual specifies. Connect shop air at the pressure on the machine’s label through a filter-regulator-lubricator, and fill the lubricator with the oil the manual lists. Have your electrician connect the 110V or 220V circuit the motor is rated for.

    Water in the air line ruins valves and cylinders. Fit a water separator and drain the compressor tank daily.

  3. Fit the assist arm and test the controls

    Bolt on the assist arm or bead-pressing tower and torque it to the manual’s values. Cycle the bead breaker, the clamp jaws open and closed, the turntable in both directions, the tower tilt or swing, and the inflation pedal. Confirm the inflation pressure limiter works before you seat a bead.

  4. First tire and break-in

    Practice on a steel wheel and an old tire before a customer’s alloys, with plenty of bead lubricant. Check every air fitting for leaks once the machine has run a few cycles, and re-torque the anchor bolts after the first week. Follow the manual’s first service (lubricator, clamp slides and the mount head).

Wheel balancers

Computer wheel balancers with manual, laser or sonar data entry.

  • Time: 1 hr
  • People: 1–2
  • Skill: Basic
  1. Uncrate, inspect and fit the removed parts

    Balancers ship with the hood guard, shaft, display and weight tray sometimes removed. Inventory everything, then fit the shaft, the hood guard and the display, and torque all of it to the manual’s values. Set the machine on a solid, level floor and anchor it if the manual calls for it.

  2. Power, calibration and accessories

    Connect the 110V or 220V circuit the balancer is rated for, on a grounded outlet; models with a pneumatic shaft lock also need shop air. Run the factory calibration with the calibration weight supplied before the first wheel, and zero the distance and width arms. Sort the cones, spacers and quick nut so they are at hand.

    A balancer that rocks on an uneven floor reads wrong. Shim or anchor it until it sits dead steady.

  3. Spin, test and break in

    Mount a known wheel, spin it, and confirm the shaft stops when the hood is raised and the brake holds. Re-spin the same wheel; the readings should repeat. Recalibrate at the interval the manual sets to keep the warranty in force.

Motorcycle and ATV lifts

Motorcycle, ATV and UTV lift tables with wheel vises and ramps.

  • Time: 30–45 min
  • People: 1
  • Skill: Basic
  1. Uncrate and release the transport locks

    Remove the crate and wrap and check for damage. Fit the ramp, the side extensions and the wheel vise if they shipped loose, and remove the transport straps or pins that hold the table down for shipping.

  2. Air or hydraulics, and level

    Air-hydraulic models: connect shop air at the pressure on the label. Hydraulic and electric models: check the oil level on the sight glass or dipstick, and connect power. Set the table on a level floor and lock the casters if it has them.

  3. Raise, safety checks and first bike

    Raise the empty table to full height and confirm the safety lock engages at each position and the release works. Lower, roll on a bike, clamp the front wheel in the vise and strap it down before you raise it.

Tools for the job

What to have on hand:

  • Socket and wrench set

    SAE and metric, 3/8" and 1/2" drive, up to 1-1/4" or 32 mm for lift anchors and pins.

  • Torque wrench

    1/2" drive, 30 to 250 ft-lb range. Every anchor, carriage bolt and tire-changer mounting bolt has a spec.

  • Rotary hammer drill

    SDS-Plus with a 3/4" carbide bit for lift anchor holes. A regular hammer drill will struggle in cured slab.

  • 4-ft level and tape measure

    Plus a chalk line and a framing square. Layout accuracy decides how a lift runs for the next 20 years.

  • Engine hoist or a second person

    Lift posts weigh 300 to 500 lb each. A hoist, forklift or two strong helpers to stand them safely.

  • Grease gun and fluids

    Multi-purpose lithium grease, AW32 hydraulic oil, the air-tool oil your tire changer’s lubricator calls for, and bead lubricant.

  • Pry bar, cutters and a utility knife

    For banding, crate panels and stretch wrap. A flat bar makes lining up pin holes painless.

  • Pallet jack or forklift

    To move crated lifts, tire changers and balancers into position. A two-post lift crate is about 12 feet long.

  • PPE

    Safety glasses, cut-resistant gloves, steel-toe boots and hearing protection for the drill and the first run.

Request the documents

Manuals and guides, sent by email:

  • Two-post lift installation guide

    PDF · Floor requirements, layout dimensions, anchor torque table, cable routing diagrams and the pre-use inspection sheet.

    Request

  • Four-post and single-post lift guide

    PDF · Runway alignment, slab and ceiling specs, caster kit fitting, and the drift test procedure.

    Request

  • Tire changer and wheel balancer setup checklist

    PDF · Air supply specs, anchor bolt pattern, lubricator settings, balancer calibration steps and the first-week service list.

    Request

  • Lift inspection and maintenance schedule

    PDF · Daily lock and cable checks, anchor re-torque intervals, hydraulic oil changes and the inspection calendar for the first year.

    Request

Rather have it done for you?

Independent lift installers and equipment technicians across the 48 states. Send the ZIP and the model and we quote a flat install price before you order, or after delivery. Multi-bay shops and fleet orders get one crew and one quote.

  • Certified installers

    Insured, experienced with the brands we carry, and current on local anchoring and electrical codes.

  • Flat-rate quotes

    One price covering labor, anchors and the final safety test. Electrical hookup quoted separately by a licensed electrician.

  • Scheduled around delivery

    We book the installer for the week after freight lands so the crate is not sitting in your bay.

  • Documented for warranty

    Signed installation and inspection report per unit. Speeds up any future warranty claim and satisfies most insurers.

Get an installation quoteCall (320) 279-4890

Typical two-post lift install: $450 to $900 by region. Tire changers and wheel balancers rarely need it.

Is the bay lift-ready?

Site readiness checklist. Every item should be true for the bay; anything that isn’t gets fixed before the lift arrives. The two most expensive words in lift installation are “thin slab”.

  • Concrete slab at least 4" thick, 3,000 PSI or better, cured 28+ days, with no cracks or joints within 6" of any post footprint. Six inches is required for some four-post and heavy-duty models.
  • Ceiling height of 12 feet or more for two-post lifts (10 feet for low-rise and four-post), measured to the lowest obstruction: door tracks, openers, lights and beams count.
  • 220V single-phase circuit on a dedicated 30A breaker within reach of the power unit, installed by a licensed electrician. 110V units exist but are slower.
  • Bay width of 12 feet or more between walls or obstacles, so doors can open fully on the vehicle with the posts in place.
  • Clearance of 3 feet on each side and 4 feet front and rear of the raised vehicle, and a clear path for the vehicle to drive in square to the posts.
  • Floor level within 1/2" across the post footprint. Small variations are shimmed; more than that needs a concrete pad poured first.
  • Door opening wide enough for the crate and a pallet jack: most two-post lifts ship in a crate about 12 feet long and 30 inches wide.
  • Two helpers and a full day booked, or a professional installation quote in hand.

Still choosing? The Lift Buying Guide walks through ceiling height, slab and power before you buy.

Setup support

Stuck on a step? Call a technician.

Setup support is free for every customer, for the life of the equipment. Mon–Fri 9–6 ET. Fleet buyers: ask about on-site commissioning.

Call a technician(320) 279-4890

Monday–Friday, 9:00 AM – 6:00 PM Eastern